El Domo is a permitted open-pit copper-gold polymetallic VMS project under construction within the Curipamba property. Curimining S.A. owns the project; Silvercorp holds a 75% interest through Salazar Holdings and Salazar Resources holds 25%. The December 31, 2025 technical report outlines 11.5 years of commercial operation at approximately 666 ktpa following about 1.5 years of construction and pre-production. The project is designed to produce copper, zinc and lead concentrates containing payable gold and silver. Wheaton's stream covers 50% of payable gold until the contractual delivery threshold and 33% thereafter, plus 75% of payable silver until its threshold and 50% thereafter.
- Country
- Ecuador
- Commodity
- Cu
- Stage
- Construction