Bowdens is a 100%-owned, pre-construction silver development near Lue. The July 2026 DFS defines a 2Mtpa Stage 1 open pit and bulk silver-lead-zinc flotation plant, with a current 173Mt resource and 47.9Mt reserve. Stage 1 has a 16.75-year life including construction; the additional Stage 2 filtered-tailings design supporting the combined 26-year plan remains at PFS level.
- Country
- Australia
- Commodity
- Ag
- Stage
- Feasibility