Bankable-feasibility-stage underground extension west of 8 Shaft with a 13-year schedule and SAMREC reserves; current work includes dewatering and long-inclined borehole drilling.
- Country
- South Africa
- Commodity
- Au
- Stage
- Feasibility
Bankable-feasibility-stage underground extension west of 8 Shaft with a 13-year schedule and SAMREC reserves; current work includes dewatering and long-inclined borehole drilling.