The 100%-owned Santa Ana project covers more than 28,000 hectares of titles and applications in the Mariquita District. Drilling identified Shoot 7 along the Santa Ana structure using a structural model of approximately 300–400m spacing between shoots, and intersected high-grade hanging-wall splays at Santa Ana and Las Maras. At Las Maras, DH637 returned high-grade down-dip mineralization, while DH640, the deepest hole at the target, returned a narrower interval with lower silver grades at that location. These results continue to inform geological-model refinement. The updated underground MRE, effective September 10, 2026, defines resources across 13 vein systems from Los Naranjos in the north to Los Mangos in the south. At least twelve known vein systems remain outside the MRE because of insufficient or no resource-definition drilling. The broader campaign has also confirmed mineralization at Aguilar and Morena.
- Country
- Colombia
- Commodity
- Ag
- Stage
- Exploration