The Pakistan renewable-energy and green-hydrogen development is held through Oracle Energy Limited, in which the listed group reports a 30 percent associate interest. The concept uses approximately 7,000 acres in the Jhimpir wind corridor and combines 800 MW of solar, 500 MW of wind and 450 MWh of battery storage with a 400 MW electrolyser. The stated annual targets are approximately 55,000 tonnes of green hydrogen or 275,000 tonnes of green ammonia. Thyssenkrupp Uhde and State Grid-related studies addressed commercial, technical, hybrid-power and transmission feasibility. Non-binding offtake arrangements exist, but bankable offtake, financing and current provincial approval status remain unresolved.
- Country
- Pakistan
- Stage
- Feasibility