Skip to content
⌘K
DashboardApuradita Project

Apuradita Project

ProductionSilver
Price-|MCap-

A separately titled Silver Elephant operation outside the disputed COMIBOL production contract. Oracle receives the greater of a 2% NSR or US$3 per tonne on unprocessed material leaving site; material is trucked to a third-party toll mill for silver-lead concentrate production. The operation has no feasibility study or declared mineral reserve.

Country
Bolivia
Commodity
Ag
Stage
Production