The planned complex is designed to produce 300,000 tonnes of copper cathode and 1.8 million tonnes of sulphuric acid annually.
- Country
- Uzbekistan
- Commodity
- Cu
- Stage
- Construction
The planned complex is designed to produce 300,000 tonnes of copper cathode and 1.8 million tonnes of sulphuric acid annually.