A large open-pit, heap-leach gold development project in the Maricunga belt, held 100% by the controlled Tiernan Gold subsidiary. A 2025 PEA is being advanced through a PFS and parallel EIA baseline work.
- Country
- Chile
- Commodity
- Au
- Stage
- Pre-Feasibility