Skip to content
⌘K
DashboardWiluna West Iron Ore Project

Wiluna West Iron Ore Project

ProductionIron
Price-|MCap-

GWR sold the Wiluna West iron-ore assets to Gold Valley but retains a production-linked royalty. Through 31 March 2027, the royalty uses an IODEX-linked sliding scale from zero to A$2 per dry metric tonne and then reverts to the original A$2 per dry metric tonne rate. Gold Valley operates the project and GWR reports royalty invoices rather than attributable mine production.

Country
Australia
Commodity
Fe
Stage
Production