Skip to content
⌘K
DashboardGander South Project

Gander South Project

ExplorationGold
Price-|MCap-

Gander South includes the Lizard Pond claims within the Vulcan option and 26 contiguous claims purchased from Puddle Pond Resources. Three 2023 rotary air blast holes were mineralized from surface through their full 65.5-metre drilled lengths, including 1.06 g/t gold over 13.7 metres. These are downhole exploration intervals, not true widths or a mineral resource.

Country
Canada
Commodity
Au
Stage
Exploration