Skip to content
⌘K
DashboardMinhub Darwin Project

Minhub Darwin Project

FeasibilityREE
Price-|MCap-

The 50%-owned Minhub project is a proposed mineral-separation plant at East Arm Port in Darwin. Its feasibility study evaluates an initial 500,000 tpa heavy-mineral-concentrate feed rate, with design allowances and new study work for a 250,000 tpa flotation circuit capable of treating fine-grained WIM-style material.

Country
Australia
Commodity
REE
Stage
Feasibility
Minhub Darwin Project — Cadoux Limited · Stream Markets