The conditional acquisition includes two underground mining rights, a 12.9 Mt mineral residue deposit, an 850 tonne-per-hour beneficiation plant, rail-loading infrastructure and surface rights. A comprehensive feasibility study is required before future underground mining.
- Country
- South Africa
- Commodity
- Coal
- Stage
- Feasibility