A 6,594-hectare wholly owned polymetallic project with a November 2025 pit-constrained resource, active drilling and an integrated DRA-led pre-feasibility study.
- Country
- Peru
- Commodity
- Ag
- Stage
- Pre-Feasibility
A 6,594-hectare wholly owned polymetallic project with a November 2025 pit-constrained resource, active drilling and an integrated DRA-led pre-feasibility study.